Industrial

Industrial Electrical Assignments include but are not be limited to:

  • Trump National Golf Courses (Installed 15KV rated switch gear and installed underground feeders to transformers located on the property to supply power for pump houses, Main Club house, Maintenance Building
  • Phillips 66 (Installed Poles, Cables, Fiber and Equipment)
  • Montclair State University (Design and install 4160 Distribution lines to By-pass existing substation during construction of new substation)
  • College of St. Elizabeth (Re-conductor over head lines on property and Converted
    voltage from 4160 to 12,470)
  • Tilcon (Installed 34,500 line from Main Substation to switch gear to relocate rock crusher)
    Pfizer Pharmaceuticals (Installed 4160 overhead lines to relocate existing underground feeders.)
  • Bristol Meyer Squib (Built Substation in factory and shipped to Site)
  • Honeywell (Installed underground feeders to replace old ones)
  • Hoffmann La Roche – Belvidere and Nutley location (34,500 lines to substation in Belvidere and Underground feeders in Nutley Location)