Substation Assignments include but are not be limited to:
– Prairie State, Illinois 150MW Solar – installation 138 kV Substation
– Fork River Michigan 150 MW Solar – installation 138 kV Substation
– Mesquite Texas- Wind 410MW – install substation 34.5 – 345
– Vista Sands Texas – installation 138 kV Substation
– South Hampton Solar Project – Substation, Switchyard Underground
– Grand Bahamas Power – installation/repair
– Keyspan Energy – Factory assembled four 69kV substations
– Walgreens – Factory assembled 115/12.5kV modular substation three 115/34.5kV
– West Plain Coop – Factory assembled 5MVA 41.6/13.8kV modular
– First Solar – Barilla installed 138KV- 34.5KV Substation
– Assembly Michigan 150 MW Solar – installation 138 kV Substation
– Fork River Michigan 150 MW Solar – installation 138 kV Substation
– Pegasus Michigan – Wind 350MW – install substation 34.5 – 345
– Great Bay Solar Project – GSU Substation 138 kV and Switchyard
– Eastern Shores Solar Project
– Grand Bahamas Power – installation of a new power station
– BorgWarner – Factory assembled 15kV substation
– Renewable Energy Systems –Factory assembled three (3) modular three
115/34.5kV substations within six (6) month time
– Georgia Pacific – Factory assembled 69kV network
– Anadarko- Black Tip Project Installed 138KV-34.5KV Substation